SCROLL DOWN
The best overall value is not always apparent by looking at a bottom-line number on a bid tabulation.
We have the country’s largest fleet of half-pipe machines, so we can keep up with projects of any size. Additionally, we leverage innovative technologies and techniques to optimize half-pipe jacketed reactor performance, durability, and reliability, which enables us to do what others can’t or won’t without increasing costs.
We can:
- Do continuous half-pipe over the knuckle and through the head
- Do half-pipe on the shell with the potential of no butt joints, using our innovative strip coil installation process
- Do 3”, 4”, 5”, 6” in schedule 10 & 40
- Leverage our 4 half-pipe machines
- Do internal half-pipe installation and polishing
Get a feel for how we deliver half-pipe fabrication with full results in this episode of Building for Real Life.
Get in touch
See how we can help you build for real life
Contact Us